A pre-production sample approval checklist is a signed list of what the sample must match before the factory starts bulk production: model and specification, performance test results, bill of materials, labels, packaging, and safety marks. Once you approve the sample, it becomes the reference every unit in the order is judged against, so approve it only after each line is checked and recorded.

This guide covers the checklist for air conditioner orders, from the first pre-production sample to the approval file you keep. It builds on the supplier checks in our 12-point manufacturer evaluation framework and assumes you have already verified the manufacturer.

What Is a Pre-Production Sample and Why Does It Matter?

A pre-production sample, also called a PP sample, is a unit built with the materials, parts, and processes planned for the real order. It is different from the first sample you may have seen at the quotation stage. A first sample, or prototype, shows the factory can build the product. A pre-production sample shows what you will actually receive.

The difference matters because air conditioners are assembled from many bought-in parts. A compressor, a PCB, a fan motor, or a refrigerant charge can change between a showroom unit and the production run. If you approve a sample that was built differently from the batch, you have no basis to complain when the batch does not match.

Some buyers call this step PPS approval. Treat approval as a contract event. After you sign, the approved sample sets the production standard, and changes need your written consent.

When in the Order Process Should Approval Happen?

Approval sits between the signed order and the start of bulk production. A typical sequence looks like this:

  • Specification and quotation agreed.
  • Deposit paid and order confirmed.
  • Pre-production sample built and sent, or checked on video.
  • Your approval, with comments if needed.
  • Materials released and mass production begins.

Sample lead times vary by customization. iClimaAir quotes about 14 days for samples and about 30 days from order confirmation to production-ready status, which shows the order of magnitude to expect. Whatever your supplier states, put the sample date and the approval window in writing, so a slow review does not silently delay shipment.

Your Pre-Production Sample Approval Checklist at a Glance

Area

What to confirm

Evidence

1. Specification

Model, capacity, voltage, frequency, refrigerant

Nameplate photo, spec sheet

2. Bill of materials

Compressor brand, PCB, motors, copper, coating

Signed BOM, part photos

3. Performance

Cooling capacity, power input, efficiency, noise

Test report with serial number

4. Safety and leaks

Electrical safety, leak test, earth continuity

Factory test record

5. Appearance and function

Finish, remote, display, modes, airflow

Video of full function run

6. Labels and marks

Energy label, safety marks, language, logo

Label proofs

7. Packaging

Carton, drop-test marks, manuals, accessories

Packed sample, packing list

1. Check the Specification Against the Purchase Order

Start with the nameplate. Read the model number, rated cooling capacity, voltage and frequency, refrigerant type and charge, and the rated current. Compare each value with the purchase order, line by line, and record the measurement of each dimension against the drawing. A unit built for 220V 50Hz and sold into a 60Hz market is a common and expensive error.

Confirm the product type as well: fixed speed or inverter, cooling only or heat pump, and the indoor and outdoor unit codes. If you are sourcing inverter models, see our guide to importing inverter split air conditioners from China for the points that change by market.

2. Approve the Bill of Materials, Not Just the Look

The bill of materials, or BOM, lists every major part in the unit. For a split air conditioner, ask for the compressor brand and model, PCB supplier, fan motors, copper tube grade, fin coating, refrigerant, and remote. Photograph the compressor nameplate on the sample and match it with the BOM.

Compressor choice is the item to protect. iClimaAir, for example, lists GMCC, Highly, Rechi, and Sanyo compressors across its range. Whichever brand you agreed, the BOM should name it, and the sample should carry it. Our overview of air conditioner compressor brands explains how to compare them.

Sign the BOM with the sample. If the factory later swaps a part for supply reasons, the signed version shows what was agreed and gives you grounds to require an equal or better substitute.

3. Review Performance and Test Data

Ask for a performance test report from the sample itself, tied to its serial number. Look at cooling capacity, power input, efficiency ratio, noise level, and operating current. Compare the results with the catalog figures and with any rating you must meet in your market. For US-bound models, check the listing in the AHRI Directory rather than relying on a brochure.

If the unit will run in hot, humid conditions, ask whether it was tested at high ambient temperature. Our article on T3 tropical testing explains why a sample that performs well at standard conditions can struggle in a Gulf or West African summer.

Small differences between a catalog and a measured value are normal, because an engineering tolerance applies. What you want is a result that sits inside the stated tolerance, measured with calibrated instruments, so that accuracy and precision are not in doubt, and a factory that explains any gap clearly.

4. Confirm Safety Tests and Leak Control

Ask for the factory's electrical safety result and leak test record for the sample. These are routine end-of-line tests, so a serious factory can produce them quickly. iClimaAir states that every unit is leak-tested, with a defect rate below 0.1%, and you can ask any supplier for the equivalent claim in writing along with the test method.

Check earth continuity, insulation resistance, and high-voltage test results where the standard for your market requires them. Compare the test list with the supplier's published quality control process to see whether the sample went through the same steps as production units. This is verification and validation in practice: the sample is checked against the specification, then confirmed to work in use. ISO 9001 certification of the factory supports this, and acceptance sampling with an agreed AQL applies later at final inspection.

5. Test Appearance and Function

Run the unit through every mode: cool, dry, fan, auto, and heat if fitted. Check the remote, the display, the swing louver, the timer, and any app or Wi-Fi function you ordered. Listen for unusual vibration and rattle. Look at panel gaps, paint finish, and the quality of the plastic.

If you cannot receive the sample, ask for an unbroken video of one operating cycle, filmed with the nameplate and a thermometer or power meter visible. A video is weaker than hands-on testing, but it can reject a bad sample quickly.

6. Check Labels, Marks, and Language

Labels are a customs issue as much as a branding one. Check the energy label, the safety and conformity marks, the importer or brand name, the country of origin, and the language on labels and manuals. Compare each item with the requirements of the destination country. Our guide to air conditioner certifications lists the marks that matter by market, and the supplier's certification page shows what it holds.

If you plan to sell under your own brand, approve the logo placement, color values, and nameplate artwork at this stage. Brand changes after approval are slow to make and often need new tooling or new labels. Buyers who plan this route should read our guide to OEM and OBM air conditioner manufacturing first.

7. Approve the Packaging as Part of the Sample

Damage in transit is a leading cause of disputes, so the packed sample deserves the same attention as the unit. Check the carton strength, the foam or corner protection, the printed handling marks, the barcode, the manual, the remote batteries, and the accessories bag. Ask for the carton dimensions and units per container, because a packing change can shift freight cost.

For a larger order, request a drop test or a stack test report for the carton. It costs the factory little and tells you how the product will arrive.

Approve, Approve With Comments, or Reject?

Every review ends with one of three outcomes, and each should be written into the approval file.

  • Approve: the sample matches the checklist. Bulk production may start.
  • Approve with comments: small items need correction, such as a label typo. List each item, assign a date, and confirm the fix before materials are cut.
  • Reject: performance, safety, or BOM items do not match. Ask for a corrected sample and a written cause.

Give written feedback on every comment, and do not accept a verbal approval with promises of later fixes. Conditional approval is acceptable only when every condition is recorded and the factory confirms it in writing.

What Should Your Approval File Contain?

Keep one file per order. It should hold the signed checklist, the BOM, the test report, photos and videos of the sample, label and packaging proofs, and the correspondence about changes. Store the sample itself in your warehouse if you can, and ask the factory to keep a matching golden sample, a sealed reference unit that stays at the plant for later comparison.

This file also supports the next step. Your pre-shipment inspection checklist uses the approved sample as the benchmark, so an inspector can check production units against a clear, signed standard.

How Does Sample Approval Fit the Wider Sourcing Plan?

The sample stage is where the evaluation scores you gave a supplier meet reality. If your shortlist used a weighted manufacturer scorecard, record how the sample performed against each category and update the score. A supplier that delivers a clean, documented sample on time earns more trust than one that needs three rounds.

If you want to see how a factory handles samples and approvals from request to production, you can talk to the iClimaAir team about your target models and market requirements.

Frequently Asked Questions

Q: What is a pre-production sample in air conditioner manufacturing? A: It is a unit built with the planned production materials, parts, and processes. You approve it before bulk production, and it becomes the reference standard for every unit in the order, including specification, appearance, labels, and packaging. Any later change to materials or design needs your written consent.

Q: Can I skip the pre-production sample to save time? A: You can, but it is risky. Without an approved sample, you have no agreed standard to hold the factory to. For repeat orders of an unchanged model, a golden sample or the previous approval file may be enough, provided the bill of materials has not changed since the last run.

Q: Who pays for the pre-production sample? A: Practice varies. Many factories charge for the sample and for courier, and some refund the fee against a confirmed bulk order. Agree on the sample cost, the courier charge, and any refund against a confirmed bulk order in writing before the sample is built, so no one disputes it later.

Q: Can production start with conditional sample approval? A: Yes, if every condition is listed in writing with a fix date, and the factory confirms it. Critical items such as safety results, the compressor, and rated performance should be settled before materials are released, because those are the hardest to correct once parts are cut.

Q: What is a golden sample? A: A golden sample is a sealed reference unit that matches the approved sample. The factory and the buyer each keep one if possible. It settles disputes by showing exactly what was agreed before bulk production began, so both sides can compare a disputed production unit against the same physical reference.